Abstract

Introduction: The paper analyzes steel production decarbonization using green hydrogen through a case study of Dillinger's Power4Steel project, with implications for the construction sector.

The Aim: To analyze the technical feasibility and economic viability of Power4Steel, quantify emission reductions and energy increases, and assess the project's contribution to construction sector decarbonization.

Material and Methods: A case study of Dillinger was used. Data were collected from primary and secondary sources. Analysis included a comparative analysis of BF-BOF and DRI-EAF processes, with an additional stoichiometric calculation.

Results: Literature data indicate 90-95% CO₂ emission reduction using DRI-EAF with green hydrogen, while the calculation in this paper, based on specific emission values of 1,921 kg CO₂/t for BF-BOF and 339 kg CO₂/t for DRI-EAF, shows a reduction of 82.4%. DRI-EAF requires 8-10 times higher electricity consumption. Stoichiometric calculation confirmed H₂ consumption of 54.1 kg/t Fe. Green steel is 30-54% more expensive (600-850 €/t). Dillinger plans production from 2028 and climate neutrality by 2045 with an investment of €4.6 billion. CBAM analysis shows traditional steel has a cost of 46,82 €/t, while green steel has none.

Conclusion: Power4Steel is technically feasible with significant emission reduction, but presents challenges (endothermicity, 8-10 times higher electricity, higher water consumption). Although green steel is currently more expensive, CBAM and EU ETS are expected to make it competitive by 2030. The project is crucial for the sustainable transformation of Europe's construction sector.